Sandıklı – Keçiborlu Road

This project is 70 km long and is being constructed as expressway. This project is one of the main arteries servicing the tourism hub of Turkey and reaches a volume of 25.000 YOGT traffic during the tourism season. Within project, 4.757.000 m³ excavation and filling works, 965.000 tons of plant mix sub-foundation, 1.355.000tons of plant mix foundation, 1.047.743 ton bituminous hot mix, 2 bridges, 1 bridged junction and small engineering structures had been executed. In addition, the project involves Sandikli and Keciborlu city throughways.

Client: General Directorate of State Highways
Start Date: 23.02.2004
End Date: 02.01.2013