Bolu Connecting Road and Bolu Junction Overpass Bridge
Financed by SFD and Republic of Turkey, the work is constructing a divided road of length 1.107 m and bridged junction. Within the project there are 1 bridged junction, 150.000 m³ excavation and backfilling, 31.000 tons of plant-mix sub-foundation and plant-mix foundation, 38.000 m² surface coating, 990 m of Ø100 post production works were done.
Client: General Directorate of State Highways
Start Date: 06.11.2003
End Date: 15.08.2006