Adıyaman City Crossing Highway
7 Km of divided road project with collector lanes on both side, contains 6 grade level and 1 bridged junctions. In Adiyaman throughway, 14 km of 1.5x1.5 m box culverts were established for rain water discharge. Within the project, 541 000 m³ excavation, 32 000 m³ concrete, 100 000 m³ sub-foundation, 70 000 ton plant-mix sub-foundation, 125 000 ton plant-mix foundation, 30 000 ton bituminous Foundation, 18.000 ton binder, 15.000 ton of anti-wear layer, 2.000 ton modified bituminous anti-wear layer production was made.
Client: General Directorate of State Highways
Start Date: 04.12.1997
End Date: 30.11.2004