Motorway on Corridor 5C Subsection Nemila-Vranduk

Project includes the construction of 5.7km of Motorway, 3.6km magistral road that also involves two 175m-length curved bridges, and approximately 5km service roads in the area nearby. Scope of major works include but not limited to earth excavation and fill, reinforced soil and retaining walls, slope stability works, bored piles, river bed regulation, box culverts, drainage lines, electrical lines, pavement works.

Client: JP Autoceste FBiH, Bosnia and Herzegovina
Start Date: 22.02.2022
End Date: 10.03.2026